Cajon del Maipo/ Embalse el Yeso & Viña Concha y Toro
1 day
Instant confirmation
About this activity
Itinerary
This is a typical itinerary for this product
Stop At: Tunel Ferroviario del Tinoco, Camino Al Volcan, San Jose de Maipo Chile
The railway had a narrow 600-mm track, and was built in 1906 by the Chilean government. Each section was inaugurated as it was completed: March 1, 1910 (between Puente Alto and El Canelo); in 1911 (between El Canelo and El Peachotón); and on June 9, 1914 (between El Melocotón and El Volcán). The railroad rema
Duration: 15 minutes
Read more
Show less
This is a typical itinerary for this product
Stop At: Tunel Ferroviario del Tinoco, Camino Al Volcan, San Jose de Maipo Chile
The railway had a narrow 600-mm track, and was built in 1906 by the Chilean government. Each section was inaugurated as it was completed: March 1, 1910 (between Puente Alto and El Canelo); in 1911 (between El Canelo and El Peachotón); and on June 9, 1914 (between El Melocotón and El Volcán). The railroad rema
Duration: 15 minutes
Included
- Snacks
- Wine tasting
- Vineyard entrance fee
- Entry/Admission - Tunel Ferroviario del Tinoco
Additional
- Confirmation will be received at time of booking
- No heart problems or other serious medical conditions
- Not wheelchair accessible
- Minimum drinking age is 18 years
- May be operated by a multi-lingual guide
- This tour/activity will have a maximum of 15 travelers
Features
Tourism
95%
Cultural
75%
Food
20%
You may also like
See all 24 Collections
Click to discover other experiences
See all
Collections
City tour
80 Activities
Collections
Valparaiso - Viña del Mar
43 Activities
Collections
Other trips
8 Activities
Collections
Cajon del Maipo - El Yeso
39 Activities
Collections
Other wine tours
48 Activities
Collections
Gourmet
15 Activities
Collections
Concha & Toro wineries
22 Activities
Collections
Santa Rita winery
19 Activities
Collections
San Cristobal hill
8 Activities
Collections
Show & Nightlife
23 Activities